ANALYSIS OF THE PRODUCTIVITY LEVELS OF LABOR IN BEAM AND PLATE STRUCTURE WORD IN THE MYZE SUMENEP HOTEL PROJECT

M . Rafi, Wateno Oetomo

Abstract


In a construction project, the productivity of the workforce is one of the fundamental factors that plays an important role in the project's success. Lower productivity increases the likelihood of work delays, whereas higher productivity reduces the chances of delays. The purpose of this study is to determine the productivity levels, labour coefficients, and productivity levels based on Labour Utilization Rate (LUR) for the beam and floor slab work in the Myze Sumenep Hotel Project. The method used in this study involved observation and work sampling methods, employing a productivity rating approach. The research findings indicate that the formwork work group has the highest productivity level in the field, with an average of 5,118 m2/person. The productivity levels for beam iron work, plate iron work, and casting work are 86,461 kg/person, 245,064 kg/person, and 7,364 m3/person, respectively. The work calm coefficient for formwork work is found to be 0,019 OH for foremen, 0,096 OH for builders, and 0,096 OH for workers. For beam iron work, the coefficients are 0,001 OH for foremen, 0,005 OH for carpenters, and 0,005 OH for workers. The coefficients for plate iron work are 0,005 OH for foremen, 0,002 OH for carpenters, and 0,002 OH for workers. Finally, for casting work, the coefficients are 0,014 OH for foremen, 0,041 OH for builders, and 0,081 OH for workers. Based on the worker utility factor (LUR) for beam and slab formwork, the average LUR productivity is 82,84%. Beam ironing work has an average LUR of 86,75%, plate iron work has an average LUR of 86,83%, and foundry work has an average LUR of 69,59%. Therefore, the productivity levels are deemed satisfactory as they exceeded 50%.


Keywords


Construction project productivity, Labor coefficient, Worker utility factor

Full Text:

PDF

References


Efrizal, Febri. (2019). “ANALISA PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN KOLOM PADA PROYEK PERUMAHAN DI PEKANBARU”. Retrieved September 10, 2022, from https://repository.uir.ac.id/9286/1/133110561.pdf

Pratama, Rizky Allam Zandriyan. (2019). “ANALISIS PRODUKTIVITAS TENAGA KERJA DI LAPANGAN PADA PEKERJAAN KOLOM (ANALYSIS OF LABOR PRODUCTIVITY IN FIELD ON COLUMN WORK).” Retrieved September 10, 2022, from https://dspace.uii.ac.id/handle/123456789/14951

Kartika, Nia; Robial, Siti Muawanah; Pratama, Agung. (2020). “ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN KOLOM DI PROYEK PEMBANGUNAN GEDUNG PEMDA KABUPATEN SUKABUMI” JURNAL MOMEN TEKNIK SIPIL SURYAKANCANA. Retrieved September 10, 2022, from https://jurnal.unsur.ac.id/momen/article/view/1207/0

Leangso, Astrid Setiani. (2018). “PENGARUH KERJA LEMBUR TERHADAP PRODUKTIVITAS TENAGA KERJA KONSTRUKSI PADA PEKERJAAN BALOK DAN PLAT LANTAI (STUDI KASUS PROYEK PEMBANGUNAN PARSLEY BAKERY & RESTO JALAN LAKSDA ADISUTJIPTO YOGYAKARTA).” https://dspace.uii.ac.id/handle/123456789/11322

Mnoor, L. H. “ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN STRUKTUR BAJA JEMBATAN PADA PROYEK JEMBATAN GANTUNG DESA KAJJAN CS DENGAN METODE DESKRIPTIF KUALITATIF.” Retrieved September 10, 2022, from http://repository.untagsby.ac.id/17347/9/JURNAL.pdf

Muslim, I. “ANALISIS PRODUKTIVITAS TENAGA KERJA.” 12–22. Retrieved September 10, 2022, retrieved from https://repository.unilak.ac.id/401/1/2388-Article%20Text-5243-3-10-20190416.pdf

Oleh, D. “ANALISIS PRODUKTIVITAS TUKANG DAN HARGA SATUAN PEKERJAAN PASANGAN DINDING BATA MERAH DAN BATA RINGAN (ANALYSIS OF LABOR PRODUKTIVITY AND UNIT PRICE WORK FOR PAIR OF BRICK AND LIGHT BRICK WALLS.” Retrieved September 10, 2022, from https://dspace.uii.ac.id/bitstream/handle/123456789/35796/14511340%20Mawardi.pdf?sequence=1

Mahdy, Abdul Hamid. “PRODUKTIVITAS TUKANG PADA PEKERJAAN DINDING BATA MERAH DENGAN METHOD PRODUCTIVITY DELAY MODEL DAN FIELD RATING (LABOR PRODUCTIVITY ON BRICK INSTALLATION USING METHOD PRODUCTIVITY DELAY MODEL AND FIELD RATING).” Retrieved September 10, 2022, from https://dspace.uii.ac.id/handle/123456789/14000.

Sutrisno, A., & Sunaryo, R. (2019). “FACTORS AFFECTING LABOR PRODUCTIVITY IN HIGH-RISE BUILDING CONSTRUCTION PROJECTS IN INDONESIA.” Civil Engineering Forum, 5(2), 101-107.

Rahman, M., & Sutrisno, A. (2019). “ANALYSIS OF LABOR PRODUCTIVITY IN CONSTRUCTION PROJECTS IN INDONESIA.” Journal of Engineering and Management in Industrial System, 7(1), 1-10.




DOI: http://dx.doi.org/10.26418/jtst.v23i2.61024

Refbacks

  • There are currently no refbacks.


Copyright (c) 2023 Jurnal TEKNIK-SIPIL

 

Jurnal Teknik Sipil Universitas Tanjungpura Indexed by :

http://www.mevjournal.com/mevfiles/indexers/04-ipi.png     

ISSN 1412-3576 (print), 2621-8429 (online)

Published by :

Department of Civil Engineering, Faculty of Engineering, Tanjungpura University

Jl. Profesor Doktor H. Hadari Nawawi, Bansir Laut, Pontianak Tenggara, Kota Pontianak Kalimantan Barat Indonesia 78124
Telp./Fax: +0561-740186
Email: jts@untan.ac.id

CP: 081256123030-085245045025

Visitor CounterJurnal Teknik Sipil

In its management and publication, this Civil Engineering Journal collaborates with:

1. Masyarakat Hidrologi Indonesia

2. Forum Studi Transportasi Antar Perguruan Tinggi (FSTPT)

 












 

 

 

 

 

 

  MAPS: