MATERIAL SUPPLY ESTIMATION USING THE ECONOMIC ORDER QUANTITY (EOQ) METHOD IN THE PUSKOPCUINA BUILDING PHASE I PONTIANAK CONSTRUCTION PROJECT

Annisa Nurul Pasyah, Syahrudin Syahrudin, Rafie Rafie

Abstract


Seeing the rapid development of the construction world, as part of the Indonesian economy, we need to support the growth of various facilities and infrastructure. In its growth, it must also improve its quality in all respects. In this case, material management plays an essential role in the construction process. The method chosen for this problem is the Economic Order Quantity (EOQ) method. The most economical amount of inventory can be determined by calculating the Economic Order Quantity (EOQ) method. This economical amount of stock can invest embedded in inventory materials, not excessive, so that it does not experience waste.

Keywords


Economic Order Quantity, Material Management, Construction

Full Text:

PDF

References


Apriyani Noor. & Ahmad Muhsin. (2017). Analisis Pengendalian Persediaan Bahan Baku Dengan Metode Economic Order Quantity dan KANBAN pada PT. Adyawinsa Stamping Indutries. Jurnal OPSI-Jurnal Optimasi Sistem Industri 10 (2).

Rampi, Renly Yohanis. Jantje B. Mangare. & Tisano Tj. Arsjad. (2018). Pengendalian Biaya Persediaan Bahan Bangunan Dengan Metode Economic Order Quantity Studi Kasus : Proyek Pembangunan Check Dam Tahap I di Perumahan Jaya Asri, Kelurahan Entrop, Kota Jayapura. Jurnal Sipil Statik 6 (11).

Setiawan, Dedi. (2020). Analisa Persediaan Bahan Material Bangunan Dengan Menggunakan Metode Economic Order Quantity (EOQ) (Studi Kasus: Pekerjaan Renovasi Gedung Aula Tahap I Lembaga Penjaminan Mutu Pendidikan (LPMP) Jl. Cipto Mangunkusumo km.2 Samarinda Seberang Kalimantan Timur). Jurnal Keilmuan dan Aplikasi Teknik Sipil Kurva S 11 (1).

Dewi, Putu Citra Puspita, Nyoman Trisna Herawati, Dan Made Arie Wahyuni. (2019). Analisis Pengendalian Persediaan Dengan Metode (EOQ) Economic Order Quantity Guna Optimalisasi Persediaan Bahan Baku Pengemas Air Mineral (Studi Kasus Pada PT. Tirta Mumbul Jaya Abadi). Jurnal Akuntansi Profesi 10 (2). https://doi.org/10.23887/jap.v10i2.22866

Handra, Tessa. & Rangian, Shibyl. (2017). Analisis Perbandingan Total Biaya Persediaan Antara Kebijakan Perusahaan Dengan Metode Economic Order Quantity (EOQ) Pada PT LCG. Jurnal Bina Manajemen 6 (1).

Kifta, D. A. 2017. Analisis Pengendalian Persediaan Dalam Hubungannya Dengan Efisiensi Biaya di PT. Hitek Indo Mulia. https://doi.org/10.31227/osf.io/mwjhp.

Junus, Stella, Muh. Yasser Arafat, Dwi Noviani, dan Sofiyah H. Sabaya. 2018. Analisis Kebutuhan Material Besi Beton Pada Pekerjaan Ruang Khazanah Melalui Pendekatan Metode EOQ (Studi Kasus: Proyek Pembangunan Kantor Perwakilan Bank Indonesia Provinsi Gorontalo).https://media.neliti.com/media/publications/425582-analysis-of-the-needs-of-concrete-iron-m-ca6ba4e4.pdf

Sutoni, Akhmad & Septo Abdul Azis. 2021. Analisis Sistem Persediaan Material dalam Proyek Pembangunan Perumahan dengan Menggunakan Metode Economic Order Quantity. IKRAITH-TEKNOLOGI 5 (1).

Fadhyl, Rizky, Caria Ningsih, & Oman Sukirman. 2018. Analisis Metode Economic Order Quantity (EOQ) dalam Upaya Meningkatkan Efisiensi pada North Wood Coffee & Eatery Bandung. The Journal Gastronomy Tourism 5 (2) 79-86.




DOI: http://dx.doi.org/10.26418/jtst.v23i2.62766

Refbacks

  • There are currently no refbacks.


Copyright (c) 2023 Jurnal TEKNIK SIPIL

 

Jurnal Teknik Sipil Universitas Tanjungpura Indexed by :

http://www.mevjournal.com/mevfiles/indexers/04-ipi.png     

ISSN 1412-3576 (print), 2621-8429 (online)

Published by :

Department of Civil Engineering, Faculty of Engineering, Tanjungpura University

Jl. Profesor Doktor H. Hadari Nawawi, Bansir Laut, Pontianak Tenggara, Kota Pontianak Kalimantan Barat Indonesia 78124
Telp./Fax: +0561-740186
Email: [email protected]

CP: 081256123030-085245045025

Visitor CounterJurnal Teknik Sipil

In its management and publication, this Civil Engineering Journal collaborates with:

1. Masyarakat Hidrologi Indonesia

2. Forum Studi Transportasi Antar Perguruan Tinggi (FSTPT)

 












 

 

 

 

 

 

  MAPS: