ANALYSIS OF TIME AND COST CONTROL IN AN ASRAMA HAJI PONTIANAK BUILDING CONSTRUCTION PROJECT USING THE EARNED VALUE ANALYSIS METHOD

Imas Yuniar Putri, Lusiana Lusiana, Rafie Rafie, Syahrudin Syahrudin, Safaruddin M. Nuh

Abstract


Efficient management of construction projects requires meticulous oversight of both time and cost elements. This investigation focuses on employing Earned Value Analysis (EVA) to supervise and regulate the Asrama Haji Pontianak Building Construction Project. EVA furnishes indispensable insights conducive to proactive decision-making by evaluating the project's advancement vis-à-vis predetermined schedules and financial plans. The study critically assesses the utilization of EVA, scrutinizing its efficacy in forecasting project outcomes, detecting deviations, and facilitating prompt corrective measures. A thorough examination of time and cost performance indicators, including the Schedule Performance Index (SPI) and Cost Performance Index (CPI), illuminates the project's adherence to established schedules and budgets. Furthermore, it delves into the challenges encountered and the strategies employed in integrating EVA into project management methodologies. From the results of the analysis of the time and cost of the Asrama Haji Pontianak building construction project experiencing a delay of 1 week from the planned time and the estimated total final project cost of Rp. 21.400.271.242,98 is less than the planned cost of Rp. 21.876.433.145,64.The findings enhance the understanding of EVA's role in optimizing time and cost control, offering valuable insights for future construction projects aiming for improved performance and efficiency.


Keywords


Construction Project Management, Time Control, Cost Control, Earned Value Analysis, Asrama Haji Pontianak

Full Text:

PDF

References


Almeida, R., Abrantes, R., Romão, M., & Proença, I. (2021). The Impact of Uncertainty In The Measurement of Progress in Earned Value Analysis. Procedia computer science, 181, 457-467.

Al Dakheel, J., Del Pero, C., Aste, N., & Leonforte, F. (2020). Smart Buildings Features and Key Performance Indicators: A Review. Sustainable Cities and Society, 61, 102328.

Damara, B. (2020). Cost Performance Analysis and Time Development Construction Project Bridge Chain Karanggeneng Nawacita Cs using The Earned Value Method. UKaRsT, 4(2), 177-191.

Elghandour, A. I. H. H., Eid, A., & El Daly, H. (2021). Improving Performance of Construction Projects By Integrating Risk Into Earned Value Management: Literature Review. Journal of Al-Azhar University Engineering Sector, 16(60), 833–850.

Harris, F., McCaffer, R., Baldwin, A., & Edum-Fotwe, F. (2021). Modern Construction Management. John Wiley & Sons.

Hidayah, F. N., Rafie, R., Nuh, S. M., Syahrudin, S., & Lusiana, L. Comparative Analysis of Direct Waste Using Software Cutting Optimization Pro and The Cost of Using Conventional Reinforcement and Wiremesh in Floor Slab Work. (Case Study: Office and Depot Construction Project of PT. Gudang Garam). Jurnal Teknik Sipil, 23(1), 103-111.

Jaya, I., & Indarti, T. P. (2021, March). Earned Value Concept Analysis on Project Monitoring (Case study: Faculty of Forestry Universitas Sumatera Utara building construction phase 1). In IOP Conference Series: Materials Science and Engineering (Vol. 1122, No. 1, p. 012006). IOP Publishing.

Lagos, C. I., & Alarcón, L. F. (2021). We are assessing the Relationship Between Constraint Management and Schedule Performance in Chilean and Colombian construction projects. Journal of management in engineering, 37(5), 04021046.

Mirajhusnita, I., & Nisa, Z. Y. (2023). Construction of Concrete Structures of Mitra Siaga 2 Tarub Hospital Using Earned Value Method: Study of Time and Cost Analysis. Educational Research (IJMCER), 5(5), 112-118.

Ngo, K. A., Lucko, G., & Ballesteros-Pérez, P. (2022). Continuous Earned Value Management with Singularity Functions for Comprehensive Project Performance Tracking and Forecasting. Automation in Construction, 143, 104583.

Nouban, F., Alijl, N., & Tawalbeh, M. (2020). Integrated Earned Value Analysis and Their Impact on Project Success. International Journal of Advanced Engineering, Sciences and Applications, 1(1), 34-39.

Pan, Y., & Zhang, L. (2021). A BIM-Data Mining Integrated Digital Twin Framework for Advanced Project Management. Automation in Construction, p. 124, 103564.

Przywara, D., & Rak, A. (2021). Monitoring Time and Cost Variances of Schedule using Simple Earned Value Method Indicators. Applied Sciences, 11(4), 1357.

Reichel, C. W. (2006). Earned Value Management Systems (EVMS)’, in. PMI® Global Congress 2006, North America, Seattle, WA. Newtown Square: Project Management Institute

Riduwan, S. P., Witjaksana, B., & Tjendani, H. T. (2023). Cost and Time Analysis Using Earned Value Method in The Construction of Sports Facilities in Kecamatan Kedewan Kabupaten Bojonegoro. Asian Journal of Engineering, Social and Health, 2(12), 1604-1652.

Song, J., Martens, A., & Vanhoucke, M. (2022). Using Earned Value Management and Schedule Risk Analysis with Resource Constraints for Project Control. European Journal of Operational Research, 297(2), 451-466.

Soltan, S., & Ashrafi, M. (2020). Predicting Project Duration and Cost, And Selecting The Best Action Plan Using Statistical Methods for Earned Value Management. Journal of Project Management, 5(3), 157-166.

Sruthi, M. D., & Aravindan, A. (2020). Performance Measurement of Schedule and Cost Analysis by using Earned Value Management for a Residential Building. Materials Today: Proceedings, 33, 524-532.

Susilowati, F., & Kurniaji, W. M. (2020, March). Effective Performance Evaluation to Estimate Cost and Time using Earned Value. In IOP conference series: Materials science and engineering (Vol. 771, No. 1, p. 012055). IOP Publishing.

Tayefeh Hashemi, S., Ebadati, O. M., & Kaur, H. (2020). Cost Estimation and Prediction in Construction Projects: A Systematic Review on Machine Learning Techniques. SN Applied Sciences, 2(10), 1703.

Thesing, T., Feldmann, C., & Burchardt, M. (2021). Agile Versus Waterfall Project Management: Decision Model for Selecting the Appropriate Approach to A Project. Procedia Computer Science, 181, 746-756.

Thoengsal, J., & Tumpu, M. (2022). Analysis of Project Cost and Time Performance Control Using Earned Value Method Analysis (EVM-A)(Case Study of Concrete Road Construction Project). International Journal Of Engineering Business And Social Science, 1(02), 80-85.

Votto, R., Lee Ho, L., & Berssaneti, F. (2020). Applying and Assessing Performance of Earned Duration Management Control Charts for EPC project duration monitoring. Journal of Construction Engineering and Management, 146(3), 04020001.

Wahyuni, E., Jawat, I. W., & Pratiwi, N. M. W. (2023). Re-planning Schedule and Costs on the Balimed Denpasar Hospital Building Development Project. Journal of Infrastructure Planning and Engineering (JIPE), 2(1), 7-20.

Zahoor, H., Khan, R. M., Nawaz, A., Ayaz, M., & Maqsoom, A. (2022). Project Control and Forecast Assessment of Building Projects in Pakistan using Earned Value Management. Engineering, Construction and Architectural Management, 29(2), 842–869.




DOI: https://doi.org/10.26418/jts.v24i2.76538

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 Jurnal Teknik Sipil

 

Jurnal Teknik Sipil Universitas Tanjungpura Indexed by :

 

ISSN 1412-3576 (print), 2621-8429 (online)

Published by :

Department of Civil Engineering, Faculty of Engineering, Tanjungpura University

Jl. Profesor Doktor H. Hadari Nawawi, Bansir Laut, Pontianak Tenggara, Kota Pontianak Kalimantan Barat Indonesia 78124
Telp./Fax: +0561-740186
Email: jts@untan.ac.id

CP: 081256123030-085245045025

Visitor CounterJurnal Teknik Sipil

In its management and publication, this Civil Engineering Journal collaborates with:

1. Masyarakat Hidrologi Indonesia

2. Forum Studi Transportasi Antar Perguruan Tinggi (FSTPT)

 












 

 

 

 

 

 

  MAPS: