OPTIMIZATION SCHEDULING PROJECT REHABILITATION BUILDING AND HALL DEKRANASDA AND KALIMANTAN BARAT MUSEUM FENCE USING CRITICAL PATH METHOD (CPM)
Abstract
This study investigates the optimization of project scheduling using the Critical Path Method (CPM) in construction projects. Focusing on the Building Rehabilitation Project, Dekranasda Hall, and Kalimantan Barat Museum Fence, the research aims to reduce project duration without altering costs. CPM is employed to map out activities in a network, identifying the critical path to enhance time management. The initial project duration was 249 days. By breaking down work items and increasing the number of workers in critical activities, the duration was reduced to 125 days. Optimization involved dividing tasks into manageable segments and determining the appropriate workforce through trial and error. The study demonstrates that effective project scheduling and resource allocation can significantly reduce completion time, highlighting CPM's value in project management for achieving efficiency and meeting deadlines. The findings emphasize the importance of detailed planning, dependency logic, and continuous monitoring to optimize construction project timelines.
Keywords
Full Text:
PDFReferences
Andiyan, A., Putra, R. M., Rembulan, G. D., & Tannady, H. (2021). Construction project evaluation using CPM-crashing, CPM-Pert, and CCPM to minimize project delays. Journal of Physics: Conference Series, 1933(1), 012096. https://doi.org/10.1088/1742-6596/1933/1/012096.
Ariana, I. K. A., Nuraga, I. K., Budiarnaya, P., Ariawan, P., Wismantara, I. G. N. N., Riana, I. N., Pangestu, I. K. P. (2021). Analisis Perbandingan Penjadwalan Menggunakan Critical Path Method (CPM) dengan Precedence Diagram Method (PDM) (Studi Kasus : Proyek Pembangunaan SD Negeri 5 Pecatu). Bali: Jurnal Ilmiah TELSINAS, 4(1), 56-61.
Ba'Its, H. A., Puspita, I. A., & Bay, A. F. (2020). Combination Of Program Evaluation and Review Technique (PERT) and Critical Path Method (CPM) for Project Schedule Development. International Journal of Integrated Engineering, 12(3), 68-75.
Chen, K., Si, J., Zhou, F., Zhang, R., Shao, H., & Zhao, H. (2015). Optimization of Air Quantity Regulation in Mine Ventilation Networks Using The Improved Differential Evolution Algorithm and Critical Path Method. International Journal of Mining Science and Technology, 25(1), 79–84.
Ervianto, W. I. 2009. Manajemen Proyek Konstruksi, Yogyakarta: ANDI OFFSET.
Gazalba, Z., & Warka, I. G. P. (2022). Evaluasi Kewajaran Schedule Kontraktor Menggunakan Work Breakdown Structure (WBS) dan Microsoft Project (Studi Pada Proyek Pembangunan SDN 5 Sokong, Tanjung, Lombok Utara). GANEC SWARA, 16(1), 1285-1296.
Hidayah, R., Ridwan, A., & Cahyo, Y. (2018). Analisa Perbandingan Manajemen Waktu Antara Perencanaan dan Pelaksanaan. Jurnal Manajemen Teknologi dan Teknik Sipil (JURMATEKS), 1(2), 281-290.
Husen, A. (2011). Manajemen Proyek. Andi Offset. Yogyakarta
Iwawo, E. R. (2016). Penerapan Metode CPM Pada Proyek Konstruksi . Jurnal Sipil Statik Vol.4 No.9 September 2016, 551-558.
Kholil, M., Alfa, B. N., & Hariadi, M. (2018, April). Scheduling Of House Development Projects With CPM and PERT Method for Time Efficiency (Case Study: House Type 36). In IOP Conference Series: Earth and Environmental Science (Vol. 140, No. 1, p. 012010). IOP Publishing.
Muhammad, A. H. (2017). Optimasi Pelaksanaan Proyek Konstruksi Dengan Metode PERT dan CPM. Jurnal Ilmiah Ecosystem, 17(2), 698-709.
Oka, J., & Kartikasari, D. (2017). Evaluasi Manajemen Waktu Proyek Menggunakan Metode PERT dan CPM Pada Pengerjaan “Proyek Reparasi Crane Lampson” di PT Mcdermott Indonesia. Journal of Applied Business Administration, 1(1), 28-36.
Safitri, E., Basriati, S., & Latifah, H. (2019). Optimasi Penjadwalan Proyek Menggunakan CPM Dan PDM (Studi Kasus: Pembangunan Gedung Balai Nilah Dan Manasik Haji Kua Kecamatan Kateman Kabupaten Indragiri Hilir). Riau: Jurnal Sains dan Matematika, 5(2), 17-25.
Saputra, N., Handayani, E., & Dwiretnani, A. (2021). Analisa Penjadwalan Proyek dengan Metode Critical Path Method (CPM) Studi Kasus Pembangunan Gedung Rawat Inap RSUD Abdul Manap Kota Jambi. Jurnal Talenta Sipil, 4(1), 44-52.
Setiawati, S., & Syahrizal, R. A. D. (2017). Penerapan metode CPM dan PERT Pada Penjadwalan Proyek Konstruksi (Studi Kasus: Rehabilitasi/Perbaikan dan Peningkatan Infrastruktur Irigasi Daerah Lintas Kabupaten/Kota DI Pekan Dolok). Jurnal Teknik Sipil USU, 6(1), 1-15.
Soeharto, I. (1999). Manajemen Proyek (Dari Konseptual Sampai Operasional). Jakarta: Erlangga.
Soleman, A. R. C., Pratami, D., & Bay, A. F. (2018). Designing Project Schedule for Migration Project Sto Dago in PT. XYZ to Accelerate Project Duration Using Schedule Compression A Lesson Learn Case Study for Another Similar Project. In Proceeding of International Seminar & Conference on Learning Organization
Sugiyarto, S., Qomariyah, S., & Hamzah, F. (2013). Analisis Network Planning Dengan CPM (Critical Path Method) Dalam Rangka Efisiensi Waktu dan Biaya Proyek. Matriks Teknik Sipil, 1(4), 408.
Taurusyanti, D., & Lesmana, M. F. (2015). Optimalisasi Penjadwalan Proyek Jembatan Girder Guna Mencapai Efektifitas Penyelesaian Dengan Metode PERT dan CPM Pada PT Buana Masa Metalindo. JIMFE (Jurnal Ilmiah Manajemen Fakultas Ekonomi), 1(1), 32-36.
Varsani, P. D., Bhavsar, A. N., & Pitroda, J. R. (2020). Effective Scheduling and Control of Construction Project Using Primavera P6: A Review. UGC Care J, 40(50), 5050-5064.
Warsika, P. D. (2016). Analisa Biaya Dan Waktu Dengan Metode Fast Track Pada Pelaksanaan Proyek Konstruksi (Studi Kasus: Proyek Pembangunan Gedung Di Kabupaten Badung). Bali: Fakultas Teknik, Universitas Udayana.
DOI: https://doi.org/10.26418/jts.v24i2.75578
Refbacks
- There are currently no refbacks.
Copyright (c) 2024 Jurnal Teknik Sipil
Jurnal Teknik Sipil Universitas Tanjungpura Indexed by :
ISSN 1412-3576 (print), 2621-8429 (online)
Published by :
Department of Civil Engineering, Faculty of Engineering, Tanjungpura University
Jl. Profesor Doktor H. Hadari Nawawi, Bansir Laut, Pontianak Tenggara, Kota Pontianak Kalimantan Barat Indonesia 78124
Telp./Fax: +0561-740186
Email: jts@untan.ac.id
CP: 081256123030-085245045025
Visitor Counter: Jurnal Teknik Sipil
In its management and publication, this Civil Engineering Journal collaborates with:
1. Masyarakat Hidrologi Indonesia
2. Forum Studi Transportasi Antar Perguruan Tinggi (FSTPT)
MAPS: