Perencanaan Sinyal Lampu Lalu Lintas Persimpangan Tiga Lengan Pada Jl.Tanjung Raya II – Jl. Panglima Aim Kota Pontianak
Abstract
Abstract– This study aim to plan traffic light at intersection three arm of Tanjung Raya II Street – Panglima Aim Street in Pontianak City.
This Study require data of intersection geometric and vehicle traffic obtained of field survey.
This study yield planning of traffic light 2 phase with cycle time 78 second. Green time of actual for phase 1 (Street of Panglima Aim) equal to 22 second, and for phase 2 ( Sreet of Tanjung Raya II) equal to 42 second.
Keywords– Traffic Light, Cycle Time, Green Time.
Full Text:
PDF ()DOI: http://dx.doi.org/10.26418/elkha.v7i1.12049
Refbacks
- There are currently no refbacks.
Copyright (c) 2015 ELKHA : Jurnal Teknik Elektro
Editorial Office/Publisher Address: website : http://jurnal.untan.ac.id/index.php/Elkha ORCID iD : https://orcid.org/0000-0002-0779-1277 |
Assiciated with : MoU/IA ELKHA - FORTEI |
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.