Perencanaan Sinyal Lampu Lalu Lintas Persimpangan Tiga Lengan Pada Jl.Tanjung Raya II – Jl. Panglima Aim Kota Pontianak

Heri Azwansyah, Ferry Juniardi

Abstract


Abstract– This study aim to plan traffic light at intersection three arm of Tanjung Raya II Street – Panglima Aim Street in Pontianak City.

This Study require data of intersection geometric and vehicle traffic obtained of field survey.

This study yield planning of traffic light 2 phase with cycle time 78 second. Green time of actual for phase 1 (Street of Panglima Aim) equal to 22 second, and for phase 2 ( Sreet of Tanjung Raya II) equal to 42 second.

Keywords– Traffic Light, Cycle Time, Green Time.


Full Text:

PDF ()


DOI: http://dx.doi.org/10.26418/elkha.v7i1.12049

Refbacks

  • There are currently no refbacks.


Copyright (c)

Editorial Office/Publisher Address:
Editor Jurnal Elkha, Department of Electrical Engineering, Faculty of Engineering, Universitas Tanjungpura,
Jl. Prof. Dr. Hadari Nawawi, Pontianak 78124, Indonesia

website : http://jurnal.untan.ac.id/index.php/Elkha
email : [email protected]

Assiciated with :

 

MoU FORTEI - ELKHA



                  

                      

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.